Our Projects
From King Khalid International Airport to NEOM, Qiddiya and the Riyadh Metro — a delivery record in the Kingdom’s most demanding environments.

King Khalid International Airport
CDC delivered an integrated works package at King Khalid International Airport covering riprap channels at Terminal 4, slope protection at Terminal 2, open stormwater channels and landscaping works — all executed inside a live operational facility without disrupting airport traffic.

Riyadh Metro Project
Under the FAST Consortium, CDC contributed to the Riyadh Metro by executing civil works and structural concrete for key stations on Lines 4, 5 and 6, alongside permanent utility connections: potable water, wastewater, stormwater, fire-fighting and irrigation networks. The scope covered more than seventeen stations as well as the Riyadh Public Transport Control Centre.

NEOM Spine Infrastructure
At NEOM, CDC is responsible for large reinforced concrete blocks and structural foundations supporting key facilities, alongside extensive roadworks including asphalt paving, levelling and modern street lighting. Our teams have also carried out complex excavation and underground tunnelling, steel, hydraulic and mechanical workshops with overhead cranes, and the West Portal sheds and workshop.

Qiddiya — Prince Mohammed bin Salman Stadium
CDC executed site establishment works at the Prince Mohammed bin Salman Stadium in Qiddiya, including the FCC-Nesma project offices and the Main Control Complex (MCC), together with the supporting infrastructure, utilities and internal roads that prepared the site for subsequent construction phases.
Specialised experience in government projects over the last 5 years
Every contract listed below was completed at 100%.
| Project | Scope of work | Client | Year | Completion |
|---|---|---|---|---|
| Riyadh Metro — Line 4, Stations 4G2 & 4G3 | Permanent utilities, civil and concrete works, hardscape and landscape, roadworks | FAST Consortium | 2021 | 100% |
| Riyadh Metro — Line 4, Station 4G1 | Permanent utilities: potable water, wastewater, stormwater, fire-fighting and irrigation | FAST Consortium | 2019 | 100% |
| Riyadh Metro — Line 5, Science Park Station | Permanent utilities: fire-fighting network | FAST Consortium | 2019 | 100% |
| Riyadh Metro — Line 6, Stations 6G1, 6G2, 6H1 & 6E1 | Permanent utilities: potable water, wastewater, stormwater, fire-fighting and irrigation | FAST Consortium | 2019 | 100% |
| Riyadh Public Transport Control Centre | Permanent utilities: potable water, wastewater, stormwater and irrigation | FAST Consortium | 2019 | 100% |
| Sports Boulevard — BP2B Cycle Bridge | Permanent utilities: potable water and wastewater networks | ArRiyadh New Mobility (ANM) | 2019 | 100% |
| Riyadh Metro — Line 3, Stations 3D2 & 3C2 | Permanent utilities: wastewater, stormwater and electrical networks | Freyssinet Saudi Arabia | 2022 | 100% |
| NEOM — Spine Infrastructure Running Tunnel | Permanent utilities, civil and concrete works, hardscape and landscape, roadworks | FCS JV | 2022 | 100% |
| NEOM — Spine Infrastructure Running Tunnel | Permanent utilities, civil and concrete works, hardscape and landscape, roadworks | SHA JV | 2022 | 100% |
| NEOM — Spine Infrastructure Running Tunnel | Stone crushing works | FCS JV | 2022 | 100% |
From our sites








Trusted by national and international organisations
We work with giga-project developers, main contractors and government entities across the Kingdom.
Have a project we can build?
Send us your scope and our technical team will come back to you within one working day.